The lead screw and guide rails need regular application of grease to ensure optimal operation.
⚠️ Maintenance Reminder
- Before maintenance, please wipe the guide rails and lead screws clean
- Maintenance cycle: every 15 days
- Shorten the maintenance cycle according to usage; if used frequently, recommend every 7 days
- If the equipment XYZ axes make obvious noise when moving, it indicates the lead screw needs urgent maintenance
- If step loss occurs during laser processing, it indicates the lead screw needs urgent maintenance
Y-axis maintenance requires laying the equipment on its side. Before laying on side, first control the Y-axis to move to the middle position, then power off and lay on side.
Apply grease evenly to the guide rails and lead screw.
After returning the equipment to upright position, power on and operate normally.